Grab Your Copy

Learn how Midea achieved these results with the help of 3D simulation software:
-
Assembly line floor area reduced by 10 percent, while simultaneously increasing production capacity by 10 percent.
-
Improved product quality, reducing the reject ratio from 1,200 defects per million to 120 dpm
-
20 percent savings in schedule (construction reduced from 15 to 12 weeks).
-
Total cost savings realized for the project were about $879,000